Bridges Grade Separations Highway Projects Neighborhood Improvements Parks Public Outreach Rail Projects Water Infrastructure Street Improvements |
STREET IMPROVEMENTSI-10/Riverside Ave. Interchange, RialtoBergCM, as Prime, provided construction management, materials testing, construction surveying and landscape construction management services to SANBAG for this $34 million interchange replacement project with Caltrans oversight, funded by state and federal funds and Rialto Redevelopment Agency bonds. Designed to alleviate traffic congestion on the bridge and freeway ramps and reduce air pollution caused by idling vehicles, the project replaced the existing five-lane Riverside Avenue bridge over the I-10 freeway with a nine-lane bridge.
Council District 8 Sidewalk Improvements Project (Phase 1) BergCM provided construction management services for this innovative neighborhood sidewalk replacement project which repaired dangerous, broken sidewalks at over 100 locations in South Los Angeles. Sidewalk repairs are desperately needed throughout Los Angeles, but due to allotted funds held in limbo by pending slip and fall lawsuits, progress towards the goal of safe sidewalks remained at a standstill for many years.
Sunset Strip Beautification ProjectBergCM provided construction management and public outreach for this high-profile project in a high-volume, congested commuter corridor located between the west City limit and the east City limit on Sunset Blvd in the City of West Hollywood.
Pigeon Pass Rd. WideningBergCM, as Prime Construction Manager, provided administration and inspection services for construction of this $6.4 million project to widen and improve Pigeon Pass Rd. from Ironwood Ave. to North City Limits in the City of Moreno Valley. Pigeon Pass Rd. provides an arterial road connection to a large residential area.
|