Street Improvements

Bridges
Grade Separations
Highway Projects
Neighborhood Improvements
Parks
Public Outreach
Rail Projects
Water Infrastructure
Street Improvements

Facebook Twitter Linkedin

STREET IMPROVEMENTS


Ocean Blvd./SR-47 Terminal Island Freeway Interchange Project

BergCM provided construction management, project controls coordination of inspection and project controls testing and contract administration for the $25 million construction of the Ocean Blvd./SR-47 Terminal Island Freeway Interchange Project for the City of Long Beach in the Long Beach Harbor District. The project included construction of a grade-separated freeway interchange to accommodate expected increases in through-traffic generated by the Pier T and Pier S developments on Terminal Island. Work entailed construction of a “split diamond” interchange and a grade separation at the Ocean Blvd./Henry Ford Ave. intersection. It was designed and built by the Port to Caltrans standards.

Project highlights:

arrow Caltrans permitted work
arrow Caltrans standard work
arrow Extensive SWPPP control
arrow Elaborate traffic control
arrow Multiple stages/phasing
arrow Multiple stakeholders
arrow Protection of existing utilities
arrow Multiple crane operations

back

the nerve
site: the nerve