Bridges

Bridges
Grade Separations
Highway Projects
Neighborhood Improvements
Parks
Public Outreach
Rail Projects
Water Infrastructure
Street Improvements

Facebook Twitter Linkedin

BRIDGES

SR-118 Widening Project

BergCM, as Prime Consultant to Caltrans District 7, provided construction management and support services in Ventura County. Services included construction inspection, office engineering and engineering support services for the SR-118 Widening Project, and assistance on SR-23, with a total construction cost of approximately $60 million.

As part of the SR-118 Widening Project, BergCM oversaw the expansion of the Ronald Reagan Hwy. eastbound from three to four lanes by providing one additional lane in each direction from Tapo Canyon Road to the LA County line in the City of Simi Valley. The construction included bridge widenings, soundwalls on CIDH piles, installing irrigation and landscaping, installing detector loops and ramp meters, providing and installing changeable message signs. Fiber-optic lines for a closed circuit television (CCTV) system were constructed beyond widening limits.

Project Highlights Include:

arrow Emergency storm damage repairs
arrow Highway rehabilitation
arrow Grinding
arrow Asphalt concrete paving
arrow Cold foam in-place recycling
arrow Striping
arrow Earthwork
arrow Reinforcing fabrics
arrow Drainage improvements
arrow Signal and lighting work
arrow Soil nailing
arrow Storm water pollution prevention plan (SWPPP) evaluation and enforcement
arrow Utility relocation and coordination
arrow Report writing
arrow Record keeping
arrow Cost analysis

back

the nerve
site: the nerve