HIGHWAY PROJECTS
Eisenhower Bridge Widening Over Evacuation Channel
BergCM served as Prime construction managers on this $2.5 million project, which completed the City of La Quinta’s arterial program for providing full-width roads within the city across drainages south of SR-111. Project work included the construction of the CIDH Pile, in channel, cast-in-place concrete bridge structure, multiple-stage traffic control and the signalization of one street intersection.

SR-118 Widening Project
BergCM, as Prime Consultant to Caltrans District 7, provided construction management and support services in Ventura County. Services included construction inspection, office engineering and engineering support services.

Seaside Ave./Navy Way Grade Separation and Seaside Navy Way/Navy Mole Grade Separation
BergCM was responsible for the field construction management of this $35 million project featuring two grade separations that were built on an accelerated schedule.

I-605/Carson St. Improvements Project (Phase 1)
BergCM, as Prime Consultant, provided all construction management services for this $5 million project, which included the widening and significant construction of Carson St. as well as on- and off-ramp reconfigurations to Interstate 605.

|