Bridges Grade Separations Highway Projects Neighborhood Improvements Parks Public Outreach Rail Projects Water Infrastructure Street Improvements |
PUBLIC OUTREACHSunset Strip Beautification ProjectBergCM provided construction management and public outreach for this high-profile project in a high-volume, congested commuter corridor located between the west City limit and the east City limit on Sunset Blvd in the City of West Hollywood. Project work included replacement/resurfacing of 1.65 miles of existing concrete roadway with asphalt rubber hot mix (AHRM) overlay, traffic signal system upgrades, replacement of broken and damaged sidewalks, curbs, gutters, driveways and wheelchair curb ADA ramps, landscaped medians, tree relocations and installations, sidewalk widening and pedestrian enhancements as well as some storm drain and catch basin work. |