Grade separations

Bridges
Grade Separations
Highway Projects
Neighborhood Improvements
Parks
Public Outreach
Rail Projects
Water Infrastructure
Street Improvements

Facebook Twitter Linkedin

GRADE SEPARATIONS

Union Ave. Overhead and Chester Ave. Undercrossing

These projects for the City of Bakersfield totaled approximately $5 million each and involved extensive coordination with Railroads Bakersfield, requiring a variety of detour roads to maintain city traffic flow. No claims were associated with them project. In particular, the Chester Ave. Undercrossing involved the complete shutdown of a major arterial street, work around live RR tracks with significant traffic, buried unidentified utilities. Construction required a railroad “shoofly” to route train traffic around the proposed grade separation structure. Once the structure was complete with train tracks, the shoofly was removed to allow construction of a pump house and storm drain storage structure within the roadway subsurface. Berg & Associates, Inc. provided full construction management and inspection services as Prime Consultant. Project was completed without any lost time safety incidents and no public safety incidents.

back

the nerve
site: the nerve